Azahar Ciudad Verde
City: Soacha
Zone: North

 

The Azahar apartments, located in Soacha, are part of Ciudad Verde’s larger project, a beautiful location surrounded by ample green spaces for the enjoyment of the entire family and complementary infrastructure, such as schools, a library, a grocery store, health clinics, a police station, and a shopping center.

Azahar is a project composed of 22 towers with six stories in each, giving a total of 526 apartments offering quality finishes in addition to providing apartments equipped with accessories in spaces such as the kitchen and the second bathroom. These apartments come with ventilation and natural lighting, guaranteeing immediate habitability.

This enclosed apartment complex has front gate security, social lounges, BBQ area, 10 outdoor super circuit machines for adults, 10 indoor super circuit machines for children, bicycle racks, administration office, 132 parking spaces for residents and 44 for visitors.

For more information access our contact form here ...

Para consultar el aviso de privacidad de datos de Ospinas y Cía S.A, ingrese aquí.
Para consultar la política de protección de datos de Ospinas & Cía S.A, ingrese aquí.
Al marcar esta casilla acepto la cláusula de Consentimiento Web de Ospinas & Cía S.A.

This project is comprised of 22 towers with 6 floors each, giving a total of 526 apartments offering quality finishes; in addition to providing apartments equipped with accessories in spaces such as the kitchen and the second bathroom, they come with ventilation and natural lighting, guaranteeing immediate habitability.

  • Floor space from approximately 53 m².
  • Living space from approximately 48 m².
  • Three bedroom, two bedroom and studio.
  • Bathroom with ventilation and natural lighting
  • Living room – dining room
  • Kitchen with beautiful finishes: modern cut, fitted stainless steel countertop,

stove and dishwasher, upper and lower cabinets, with extractor and veneer

floor

  • Textured finished ceiling
  • Green areas
  • Bike spaces
  • Super external circuit with 10 machines for adults
  • Super indoor circuit with 10 machines for children

Social area with spaces for:

  • Library
  • Technology exhibition room
  • Garbage room

Social lounge with spaces:

1st floor

  • Playroom
  • Administration
  • Reception
  • Waiting room
  • Available space (Minimarket)

2do piso

  • BBQ terrace Communal living

Soacha – Ciudad Verde
Business Office
Monday to Sunday and Holidays from 10:00 a.m. to 4:30 p.m.
Telephone: (+571) 7253723 – 7253718
Cellphone: (+57) 3212418931

Bogotá
Showroom Ospinas & Cia.
Calle 79b No. 5 – 81
Monday to Friday – 8:00 a.m. to 5:30 p.m.
Telephone: (+57 1) 326 7060 Ext. 149

Apartment Model 61 m2

apmazahar1 azaharapg2 azaharapg3 azaharapg4 azaharapg5 azaharapg6 azaharapg7 azaharapg8

Apartment Model 48 m2

azahar-48-1 azahar-48-2 azahar-48-3 azahar-48-4 azahar-48-5 azahar-48-6 azahar-48-7 azahar-48-8

Torre tipo

AZH_t1_1p_01AZH_t1_2p_01

Apartamento tipo A

plano-1

Apartamento tipo A y A1

plano 2

Apartamento tipo A y B

AZH_tipoA-B_01 48M2AZH_tipoA-B_02

Apartamento tipo C

AZH_tipoC_02

RENDER AZAHAR

NIK_0988 NIK_1004 NIK_1022 NIK_1028 NIK_1031 NIK_1038 NIK_1045 NIK_1072 NIK_1081 NIK_1102 NIK_1114 NIK_1117 NIK_1125

Development progress February  2016

DSCN2295 DSCN2303IMG-20160224-WA0006 IMG-20160224-WA0007 IMG-20160224-WA0008 IMG-20160224-WA0010

Development progress January  2016

DSCN2248 DSCN2247 DSCN2246

Development progress September  2015

aoazaharseptiembre3 aoazaharseptiembre4 aoazaharseptiembre5 aoazaharseptiembre6 aoazaharseptiembre7 aoazaharseptiembre8 aoazaharseptiembre9 aoazaharseptiembre1 aoazaharseptiembre2

Development progress August 2015

aoazaharagosto1

Development progress July  2015

aoazaharjulio1

Development progress June 2015

aoazaharjunio1 aoazaharjunio2 aoazaharjunio3 aoazaharjunio4 aoazaharjunio5

Development progress May  2015

aoazaharabril1Azahar avance mayo de 2015 (1) Azahar-avance-mayo-de-2015-(2) Azahar-avance-mayo-de-2015-(3) Azahar-avance-mayo-de-2015-(4)

Development progress April  2015

Azahar avance abril de 2015 (1)Azahar avance abril de 2015 (2)

Development progress March  2015

avance marzo de 2015 (3) avance-marzo-de-2015-(1) avance-marzo-de-2015-(2)

Development progress February  2015

Azahar avance febrero 20154Azahar avance febrero 20153Azahar avance febrero 20155

Development progress January  2015

Avance de obra enero 20151 Avance de obra enero 20152 Avance de obra enero 20153 Avance de obra enero 20154

imperialbrochure